Last update: 02/27/2012
Capitol Lake Reports
All files below are Adobe Acrobat format (
)
unless otherwise specified.
Capitol Lake Adaptive Management Plan
- Final Environmental Impact Study (May 1999)
- Vision for the Next Ten Years, 2003 – 2013 (October 2002)
- Capitol Lake Adaptive Management Plan 1999 – 2001 (May 1999)
Deschutes Estuary Feasibility Study (DEFS) - Technical Reports
- Deschutes Estuary Feasibility Study Final Report (June 2008)
- DEFS Net Social and Economic Benefit Analysis (June 2007)
- DEFS Restoration Study Biological Conditions Report (September 2006)
- Addendum to the DEFS Restoration Study Biological Conditions Report (January 2007)
- DEFS - Hydrodynamics and Sediment Transport Modeling (October 2006)
- DEFS - Engineering Design and Cost Estimates (February 2007)
- DEFS - Independent Technical Review (October 2007)
- DEFS - Net Benefit Analysis - Stakeholder Involvement (June 2006)
CLAMP - Alternatives Analysis
- Community Economic Values for the Capitol Lake Basin (May 2009)
- Capitol Lake Alternatives Analysis - Dredging and Disposal Addendum (March 2009)
- Study of Cultural & Spiritual Values Associated with Future Alternatives for Capitol Lake Basin (2009)
- Capitol Lake Alternatives Analysis: Incorporation of Fine-Grained Sediment Erodability Measurements Into Sediment (2008)
- Capitol Lake Alternative Analysis - Dredging and Disposal (August 2008)
- Capitol Lake Alternative Analysis - Hydraulic Modeling (November 2008)
- Capitol Lake Alternative Analysis - Low Lying Infrastructure (November 2008)
- Capitol Lake Dam Condition Assessment And Life Expectancy (October 2008)
- Capitol Lake Dam Condition Assessment And Life Expectancy Appendices A- E (October 2008)
- Implications of Capitol Lake Management for Fish and Wildlife (September 2008)
- Capitol Lake Alternatives Analysis Final Report (July 2009)
Technical Reports By Others
- Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coli form, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study Water Quality Study Findings (October 2008)
- Sediment Characterization Study - Budd Inlet (March 2008)
Long-Term Management Recommendation for the Capitol Lake Basin
- Steering Committee Recommendation (September 2009)
- Capitol Lake Alternatives Analysis – Public Involvement Summary Part A (August 2009)
- Capitol Lake Alternatives Analysis – Public Involvement Summary Part B (August 2009)
CLAMP Fact Sheets
- Fact Sheet 1 - 10-Year Action Plan (2006)
- Fact Sheet 2 - Deschutes Estuary Feasibility Study (2006)
- Fact Sheet 3 - Reference Estuary and Biological Conditions Report (2006)
- Fact Sheet 4 - Hydrodynamics and Sediment Transport Modeling Report (2006)
- Fact Sheet 5 - Engineering Design and Cost Estimate Report (2007)
- Fact Sheet 6 - Net Social and Economic Benefit Analysis (2007)
- Fact Sheet 7 - Creation of Capitol Lake (2007)
- Fact Sheet 8 - Alternatives Analysis (2008)
- Fact Sheet 9 – Advisory Committee Recommendation





